540

Spud carriage cylinder
1.4 ton

2

Discharge pipe FP1 + DH + FP2
0.8 ton

Hoisting Hole diam. Thickness
eye mm mm

Radius Hoisting capacity
mm ton

Shackle (greenpin)
ton

A
B

75
75

30
100

100
110

15
55

17
55

5620 F 3666

923

C

45

40

70

15

17 F

A
Hoisting eyes painted white

IVCoupled pontoons
51.3 ton

3

Discharge pipe FP3
1.3 ton ł

4

Discharge pipe FP4
1.1 ton ł

Maximum angle
Between lifting slings and hoisting eyes

Longitudinal

Cross
10%

6040

4879

30%%d

%d

5

Discharge pipe FP10 + P6
0.9 ton

6

Swivel bend P12 + FP 11
3.9 ton

"B" 1415

Note:
Hoisting eyes painted white

1572

For transport only use hoistingeyes "B" 8150 For transport and storage all parts placed on wood

-25

-24

-23

-22

-21

-20

-19

-18

-17

-16

-15

-14

-13

-12

-11

-10

-9

-8

-7

-6

-5

-4

-3

-2

E

2447

"B"

E

2669

7

Spudram
2.5 ton

"B"

A
920 2685

III

Spud carriage (stripped)
20.6 ton

5290

"C"

"C"

803

1580

6102.2 ton

0.1 ton

"C" 960

"C"

D

3254 2490 8.1 ton 12.5 ton

2854

8

Spudkeep

9

Platform to follow pontoon

D

1776 10

Support hydraulic hoses
0.2 ton

11

Support hydraulic hoses (on spud carriage)
0.1 ton 1075 701

710

1690

1330

1540

5151

500

2255 19.6 ton 31.7 ton
5214

10%%d

94

5

12 13
14

Support discharge pipeline
3 x0.3 ton

15

Hydraulic pipelines
0.3 ton 8851

5473

3378

12760

2739

C

1506

3355

8250

100

10

53

C

60%% d

1488

905

435

8441

1770 5415

-25

-24

-23

-22

-21

-20

-19

-18

-17

-16

-15

-14

-13

-12

-11

-10

1869

-9

-8

-7

-6

-5

-4

-3

-2

6980 12058

3496

18

19

Seelist of colli

B

POSSIBILTY "B"

B

ARROWS

NO. OF

-POS NO. NUM BER DESCRIPTION CODE NO. MATERIAL MASS IN KG. M. B.B. TYPE

REMARKS

DATE

B65c
DRAWN DATE

DRAWN

IHC Beaver Dredgers B.V.
P.O. Box 3 3360 AA Sliedrecht Holland www.ihcmerwede.com
This document remains the property of IHC Beaver Dredgers B.V. All rights reserved. This document or any part thereof may not bemade public or disclosed, copied or otherwise reproduced or used in any form or by any means, including but not limited to use hereof for the design and manufacturing of identical or similar parts or products, without prior permission in writing from IHC Beaver Dredgers B.V.

PdG
SCALE

04-2008

1:100

A

Hoisting plan with possibility A,B,C
DESCRIPTION

A

02583
MVC NO. NO. OF SH.PLOT DATE

follow pontoon
plotarchief gereed

ORDER NO.

DIV. NO.

SUB NO.

REV.

SH. NO.

SIZE

MOD

3

09-09-2010
2

DRW. NO. 79125 - 0310 - 030
1

B

2

A1

8

7

6

5

4

3

8

7

6

5

4

3

2

1

1

540

Spud carriage cylinder
1.4 ton

2

Discharge pipe FP1 + DH + FP2
0.8 ton

Hoisting Hole diam. Thickness
eye mm mmRadius Hoisting capacity
mm ton

Shackle (greenpin)
ton

A I 923 5620 F 3666
"A"

75
75

30
100

100
110

15
55

17
55

Follow pontoon PS
22.5 ton

B

C

45

40

70

15

17 F

A

Hoisting eyes painted white
"A"

3

Discharge pipe FP3
1.3 ton ł

4

Discharge pipe FP4
1.1 ton 3030 ł

Maximum angle
Between lifting slings and hoisting eyesLongitudinal

Cross
10%

6040

4879 "B" "B"

30%%d

%d

5

Discharge pipe FP10 + P6
0.9 ton

6

Swivel bend P12 + FP 11
3.9 ton

Note:
1415
Hoisting eyes painted white 1572

For transport only use hoisting eyes For transport and storage all parts placed on wood

E

2447
21 101
0

E
05

7

Spudram
2.5 ton

2669

9.3 ton

11

13.2 ton

A
8850 920...